Sullivan Palatek SPEH-200 Externally Heated Regenerative Air Dryer

SP SPEH-200 Externally Heated Regenerative Air Dryer, 1-1/2 in Inlet Connection, 1-1/2 in Outlet Connection

SP SPEH-200 Externally Heated Regenerative Air Dryer, 1-1/2 in Inlet Connection, 1-1/2 in Outlet Connection SPEH-200

Compressed air enters the dryer and is directed to a tower by the inlet valves. It then proceeds up through the tower, gives up its moisture and then exits through the outlet check valve. A portion of the dry air, called purge is metered and expanded to atmospheric pressure through an orifice assembly. The purge air enters a circulation chamber where it is heated and its moisture holding capacity is increased. The purge air also transfers heat to the desiccant in the regeneration tower by entering the tower through the purge check valve. As the desiccant temperature increases it releases the previously adsorbed moisture. The moisture is picked up by the heated purge air and exits to the atmosphere through the purge exhaust valve and muffler. The drying and regenerating cycles occur simultaneously for 4 hr. The regeneration cycle begins with 2.5 hr of heating and 1.4 hr of cooling, then the tower repressurizes before the inlet valves invert and the process starts again.
SP Externally Heated Regenerative Air Dryer, Series: SPEH, 1-1/2 in Inlet Connection, NPT Inlet Connection, 1-1/2 in Outlet Connection, NPT Outlet Connection, Air Flow Rate: 200 scfm, 120 psig Air Pressure, 65 in Overall Height, 67 in Overall Width, 19 in Overall Depth

Air Flow Rate      :      200 scfm
Air Pressure      :      120 psig
Inlet Connection Size      :      1-1/2 in
Inlet Connection Type      :      NPT
Outlet Connection Size      :      1-1/2 in
Outlet Connection Type      :      NPT
Overall Depth      :      19 in
Overall Height      :      65 in
Overall Width      :      67 in
Series      :      SPEH
  • NEMA 12 electrical
  • OSHA approved mufflers
  • Illuminated On/Off power switch
  • ASME/CRN vessels
  • ASME relief valves
  • Control air filter
  • Adjustable purge flow with indicator
  • Tower pressure gauges
  • Independent desiccant fill and drain ports
  • 15 W/sq-in incoloy sheath heater
  • Insulated heater and purge piping
  • Heater over-temp hi-limit system
  • pdfCatalog https://assets.unilogcorp.com/267/ITEM/DOC/SP_SPBS115_Catalog.pdf
  • pdfWarranty Information https://assets.unilogcorp.com/267/ITEM/DOC/SP_SPBS115_Warranty.pdf